of

In connection with the reconstruction of the damaged infrastructure after the strong floods in the region of Piura and Chiclayo, Trunz was appointed to install a water treatment unit in order to proof the function in a challenging environment (climatic conditions, remote installation, local operation).

As the pilot project is performing well, the local responsible organizations are considering to multiply this installation in other locations around the region of Piura and Chiclayo.

The pilot installation was donated by the Swiss Agency for development and international collaboration. Installation and technical training was supervised/assisted by our local distribution partner and our technician who visited the location.